Workshop material. This page records an investigation. A proposal here is not, by itself, an adopted Commonplace decision.

Higher-order check evaluation

Goal

Evaluate, alone and before any composition relies on it, the check that the one improvement procedure runs first: does this note need a change to what it is (a split, a merge, a rehome, a rejection, a different claim), and with what force. Produce a calibrated check, or the finding that no cheap check can do this job.

The operator opened this workshop on 2026-11-13. The procedure's default composition stops on a strong proposal and proceeds past a weak one or none, so this one judgment decides whether lower-order edits run at all. The proposal names the rule higher-order concerns before lower-order concerns; this check is the one on the higher-order concerns. It is also the hardest judgment in the procedure: on 2026-11-12 the full improvement pass, at several dollars for one short note, proposed three narrower claims where the operator's answer was deletion.

Start here

This workshop stands alone. It needs no decision from any other workshop or proposal, and nothing below waits on the improvement procedure being built. The one design rule it works under is atomicity:

  • The check is one operation on one note. Its inputs are files: the note, and whatever fixed context the check's own text names. It reads no conversation, no other operation's unrecorded output and no run state.
  • Its output is one stored result per note that a batch run can keep and a later reader can interpret without the session that produced it.
  • It can therefore be run by itself on one note, on a labelled set, or on a whole collection, and rerun after its wording changes.

A check that only works inside a composed improvement run fails this rule, and that is a finding to report, not something to work around.

The existing shape fits without new code. A review gate is a criterion file under kb/instructions/review-gates/ with the fields the review-gate type lists, run with commonplace-review run gates <notes> --criteria <gate id>, with results, freshness, profiles and cost as the review system describes. Its three outcomes map onto what this check returns: pass for no proposal, warn for a weak proposal, fail for a strong one, with the kind and the grounds in the findings. Start with that mapping and report where it strains. Draft wordings can live in this workshop until one is worth placing in the catalog; say how you ran a draft that is not yet there.

Where state goes: the check's results are ordinary review results in the shared store under kb/reports/state/review/results/, keyed by note and criterion, exactly as they would be if an improvement run had asked for them. Nothing is filed under this workshop's name there. The store keeps one result per note and criterion, so give each wording of the check its own criterion id; otherwise a rerun overwrites the wording it is to be compared with. Labels, operator judgments and comparisons are this workshop's own and stay in this directory.

Two practical matters to settle early and write down here:

  • Historical texts. A labelled positive must be judged on its text from before the change. The batch command reviews files in the checkout, so decide how the old text is supplied (a worktree at the earlier commit, or copies under this workshop) and keep the outcome out of the worker's view, including the note's later path, its redirect and any log entry about it.

Decision (2026-11-13). Each historical text is judged in a detached git worktree at the commit that holds it, created outside the repository under the session's scratch directory with a neutral name (w02, k03). The worker's working directory is that worktree, so it sees the note at its own path among the neighbours of that date. Before the run, kb/work/, kb/reports/, kb/log.md, kb/messages/ and scripts/cloud-session-setup.sh are deleted from the worktree. The first four can describe reviews in progress, and the last is a session hook. Kept notes are judged the same way, at the commit before the review that kept them, so both sets see the same kind of tree. The worktree's own review state holds the results; it is copied out before the worktree is removed (see first-results.md for where). Leaks not closed: the library at that commit may contain a citer's sentence about the note that a later change answered; the worktree path and its .git file name the main checkout, which a worker could read by absolute path although the prompt confines it to linked files; the worker has Read, Grep and Glob, so nothing but the prompt stops it from reading those files. - Spend. Run one note, then the labelled set, before the collection. State the profile and the cost of each run, and ask the operator before a run over all of kb/theory/.

What is being tested

One atomic review operation, written as an instruction that a batch run can apply to one note at a time and that returns: no proposal, or a proposal with its kind, its force (strong or weak) and its grounds. The check must run through the existing batch machinery (commonplace-review run gates over a directory with one criterion), so that it can be applied to every note in kb/theory/ and its results kept as ordinary review results. If the current gate shape cannot carry a kind and a force, say what it lacks; that is a finding for the procedure proposal's atom type.

Questions

  1. Does it find the known cases? Notes that were later split, merged, rehomed, retitled to a different claim or deleted are labelled positives. Git history and kb/log.md name them. The check runs on each note's text as it stood before the change. The two episodes of 2026-11-12 are the first two: the note deleted in commit bbc5ef0a4, and the note retitled in 765cbcb8b. The check must not be shown the outcome (calibrating semantic gates against labelled fixtures requires non-leaking known cases).
  2. How often does it propose something on the collection as it stands? Run it on all of kb/theory/. The procedure assumes that most notes get no proposal. Record the rate of none, weak and strong.
  3. Are its strong proposals right? The operator judges a sample of the strong proposals from question 2, with a reason each. Those answers are the first labelled set made for this check rather than recovered from history.
  4. Is weak used as an escape? A check under uncertainty can label everything weak, since weak never stops a run. Compare the weak share on known positives with the weak share on the collection.
  5. What does a run cost? Per note and for the whole collection, by worker profile. The check runs first on every improvement run, so its cost is paid every time.
  6. Does a stated criterion beat free judgment? Compare at least two wordings of the check, for example one that asks for the note's claim and which neighbours own it, against one that asks the question directly.

Fixed boundaries

  • The check proposes; it never edits. Every claim-level change stays with the author under ADR 080.
  • Evaluate this operation alone. Do not measure it through a composed improvement run.
  • Results are review results in the state tree. Labels and operator judgments made here are kept in this workshop until they are extracted.
  • No statistic from this workshop lowers any authority grade. That decision belongs to authority grades and learning from operator decisions.

How to advance the work

  1. Collect the labelled positives from history, with the commit that holds each note's text before its change, and a matched set of notes that were reviewed and kept.
  2. Write the first wording of the check as a review criterion.
  3. Run it on the labelled set, then on all of kb/theory/.
  4. Take the operator's judgments on a sample of strong proposals.
  5. Revise the wording and repeat on fresh notes, keeping every wording and its results.

Current state — 2026-11-13

Stage one ran steps 1 to 3 on the labelled set only: labelled-set.md holds 16 positives and 14 kept notes, and first-results.md the outcomes of two wordings, direct and claim-ownership. Both wordings proposed almost nothing on kept notes and missed most positives: 3 of 16 and 2 of 16. The check as worded is quiet, not calibrated.

The operator stated on 2026-11-13 that these checks are to be run on opus: sonnet is not enough for them. Stage one ran sonnet on all 30 notes and opus only for the direct wording on 14 of them, so the sonnet rows are not calibration evidence. The opus subset proposed nothing on 10 positives and 4 kept notes, which points the same way but covers one wording and under half the set. Every later round uses opus. The misses were mostly value judgments the operator made about a note's worth, which neither wording asks for. The whole-collection run has not been made and needs the operator's approval; the first-results file recommends revising the wordings first.

Round two ran three revised wordings on opus against the same labelled set: second-results.md. The revised direct wording, direct-value, adds a value test, treats a parent's extends link as neutral, and reads the collection contract. It found 5 of 16 positives (2 strong, 3 weak) and proposed nothing on 14 kept notes. Its variant without the base-rate sentence gave identical outcomes on all 30 notes, so that sentence was not what kept the check quiet. The revised claim wording, claim-need, found 4 of 16 and proposed nothing on the 7 kept notes it was run on. The round used 83 launches and $33.09. Most positives are still missed, chiefly merges the operator judged not worth a separate note and retitles after a body rewrite. The next round should revise direct-value along the four changes listed in second-results.md and run each wording twice. The whole-collection run still waits for the operator; at about $0.38 per note it would cost about $145 for direct-value alone.

Round three ran one revised wording, direct-tests, twice on opus against the same 30 notes: third-results.md. It adds a parent-loss test, a title-against-body test and a policy-or-claim place test. It found 5 of 16 positives in one run and 6 in the other, 4 in both. Neither run proposed anything on the 14 kept notes. The two runs agreed on 26 of 30 notes in outcome and kind. The three outcome flips were all between no proposal and a weak proposal. The policy-or-claim test reached the wrong-place case P11 in both runs. The title-against-body test reached none of the four different-claim positives. The round used 60 launches and $24.25. The wording was written after seeing which notes earlier rounds missed, so this set no longer tests generalization. The reserve cases in labelled-set.md are held back unrun, as the test set for the next wording.

A fourth wording, theory-claim, was drafted on 2026-11-14 and has not been run. Against the third-round wording it makes two changes. It drops the title-against-body test, which found none of the different-claim cases and duplicates the catalog's title-body alignment gate. It declares its scope: the check is written for and tested on theory notes only, and says nothing yet about other collections.

A general-claim test was drafted for it the same day and withdrawn. Its questions are already asked by frontmatter/claim-strength and semantic/unwarranted-scope, as the overlap map records. Both gates had run on the note that prompted the test, and both had written the general claim out and judged it derived, not asserted. So a requirement to write the claim down would not have changed their verdicts. What that note shows is a different gap: its general claim is real but thin, and most of its text is an account of local decisions. Only prose/proportion-mismatch warned about that, and nothing read the warning as a sign that the note might be misplaced or need a split.

The wording is to be judged on the reserve cases, not on the 30 notes the earlier wordings were tuned on.

Completion

This is a standing workshop. The operator stated on 2026-11-13 that the check will be recalibrated many times, as wordings, models and the collection change, so no single result closes it. Each calibration round leaves its wording, labelled set and results here. Two events change the workshop's status without ending the work:

  • a wording finds the known cases, proposes nothing on most of the collection, and has an operator-judged sample of its strong proposals; it is then extracted as an atom under kb/instructions/ with its evaluation recorded, and later rounds calibrate that atom;
  • the evidence shows no wording at acceptable cost can do this, and the procedure proposal is revised to say what runs first instead.

Complete file listing (generated at build time)