Decision lifecycle and evidence

Commission

Opened on 2026-09-25 at the operator's request. Determine how Commonplace should preserve a decision's development from proposal through deliberation, implementation, and later evaluation, while making its current state clear to agents and readers.

The operator connected this to an earlier concern: evidence must be retained during ordinary work before later self-improvement measurements can use it. ADRs are one form of evidence of deliberation. The operator proposed exploring whether ADRs could be views over a richer record, with proposals as an early stage. This workshop investigates that direction; it does not adopt a new storage model or change the current ADR contract.

Retention direction fixed by the operator

On 2026-09-25 the operator clarified the retention policy for this design: Commonplace must own records containing the most obviously important data. Those records may point to agent sessions for additional detail, but their essential evidence must survive loss of access to those sessions. Cleanup risk motivated this direction. Retention differs between harnesses and must not serve as Commonplace's evidence guarantee.

Sessions are useful source material. Capture the important facts while that material is available, and retain a session identifier or link when supplied. A session pointer supplements the owned record; it cannot be the only place holding a deciding reason or a result needed to assess the change. Preserve the relevant excerpt, measurement, or small evidence artifact when a summary alone would not support later inspection. Missing facts remain missing; later reconstruction must be distinguished from contemporaneous capture.

The working interpretation of “most obviously important” is the information needed to understand, revisit, and evaluate the choice:

  • the problem, relevant starting state, and constraints;
  • the options actually considered, the choice, and deciding reasons;
  • who supplied consequential judgments, especially human interventions;
  • the expected effect, uncertainty, and what would prompt reconsideration;
  • what was implemented and verified, with artifact or commit references;
  • observed outcomes, failures, reversals, and available cost measurements;
  • dates and source-session references for recovering further detail.

This list is a starting capture scope, not an adopted schema. Record facts as they become available: a pre-implementation decision cannot already contain implementation or outcome evidence. Preserve its original expectations when adding later results. The record's durable home and capture trigger remain design questions, including how capture covers interrupted or abandoned work.

The acceptance test is to make every session link unavailable: can a later reader still recover the decision, its grounds, its implementation state, and the evidence actually retained for its outcome? Detailed reconstruction may be lost, but essential facts must remain. A missing measurement must still be identifiable as missing, rather than silently turning into a success claim.

Motivating problem

The ADR 089 episode records the immediate inconsistency. An agent wrote an accepted ADR into kb/reference/adr/ before its implementation. Commonplace's ADR contract reserves that location and type for decided and implemented choices.

The operator reports that this is a recurring, easy mistake. The intended decision needs to be written before implementation so it can guide the work. The usual practice is to draft the ADR in the workshop and promote it after implementation. An agent can produce the needed decision text but place it directly in the directory named for that artifact, accidentally making it look like a record of the shipped system.

The current contracts make that distinction awkward: a proposal is undecided, and an ADR is decided and implemented. Workshops can hold the intervening state, but its meaning and promotion depend on placement and authoring discipline. The design should make the necessary pre-implementation record easy to create without falsely describing implementation as complete.

Questions to settle

  • When should Commonplace search sessions for evidence to retain? The operator clarified that future telemetry needs are open-ended and sessions already contain much of the material. Map demand-driven searches, lifecycle events, session hooks, scheduled processing, and protection against source loss; compare concrete mechanisms in the reviewed systems. The trigger design space records this follow-up commission, candidate policy, and mechanism inventory.
  • What is the continuing object: one decision record with several views, linked proposal and ADR documents, or another arrangement? What should have a stable identity through revisions, partial adoption, and supersession?
  • How should acceptance of a choice, implementation progress, and evidence of benefit be represented separately? How should rejected, withdrawn, abandoned, and partially implemented choices remain available for analysis?
  • Which evidence must survive each transition: original problem and available evidence, alternatives, deciding reasons, participants and roles, expected effects, implementation departures, costs, and observed outcomes? Which parts already survive in git, proposals, workshops, or reports?
  • Which reader needs each view: deliberation, implementation, understanding the shipped architecture, revision, or evaluation? What may each view claim about the system, and what evidence permits that claim?
  • What prevents the ADR 089 placement error? Compare a clearer drafting and promotion procedure with richer records or derived views before selecting machinery. Distinguish mechanically checkable evidence links from judgments about whether implementation actually fulfills a decision.
  • How can decision-time expectations remain distinguishable from later explanations and observations? How does a later evaluation find the original record, including unsuccessful choices, without treating an ADR citation or an accepted implementation as proof of improvement?

Evaluation boundary

A satisfactory design must represent a settled choice before implementation, an implementation in progress, a shipped change whose benefit is unmeasured, and a later outcome that contradicts the original expectation. It must also handle partial adoption and a proposal that never ships. These are cases to test the design against, not a prescribed status enum.

Every case must also pass the session-loss test in the retention direction above. Workshop closure must preserve the owned evidence needed for those uses, even when the source sessions are still accessible at closure time.

Use the recorded ADR 089 episode as one concrete test. The recurrence claim comes from the operator; this workshop has not measured its frequency. Added recording, retrieval, and maintenance costs must be justified by a named use. No database, event log, generated ADR renderer, schema, or repository-wide migration is selected at opening.

Coordination and current contracts

  • ADR 089 was implemented by the tag-contract-convergence workshop, which closed in commit b745bcc8. This workshop records the lifecycle failure; that later completion does not erase the earlier mismatch.
  • ADR routing and the site back-pointer proposal concern finding decisions when changing their consumers. This workshop owns lifecycle and evidence retention; coordinate changes to shared ADR surfaces.
  • The ADR type, proposal type, and reference collection contract remain binding until changed through an adopted design. Drafts belong here under the current workshop exception.
  • ADR 056 restricts links into archived proposals; ADR 074 assigns change history to git; ADR 085 deletes withdrawn proposals after extracting current content. Evaluate whether these retention and access rules serve the proposed evidence use before revising them. Recording evidence need not mean loading all history into routine work.

Evidence and conceptual inputs

What closes this workshop

Close when the design question has a recorded disposition: either a finished design proposal naming the retained evidence, lifecycle distinctions, views, consumers, adoption criteria, and changes to existing contracts, or a reasoned decision that a smaller procedural repair suffices. Record how the candidate handles the evaluation cases and what remains untested.

Before deleting the workshop, extract any durable finding and the incident evidence its future consumers require. Promotion of a design proposal closes this investigation without claiming that its implementation has shipped. Remove the workshop from the active list at closure.