Synthesis distinction pilot: execution and result
The eight-call feasibility check ran on 2026-10-05 with one frozen Dynamic Cheatsheet case. The combined instruction treatment did not meet the predeclared promising-signal rule: its writer omitted the targeted retrieval-synthesis distinction, and its reviewer accepted the known overclaim in a fixed draft. The control did the same. In a second fixed draft, the treatment reviewer accepted a supported qualification while the control reviewer falsely blocked it. These are one response per condition and case, not estimates of reliability or causal effects. No production instruction was changed.
Scores and source adjudication give the individual judgments,
coverage losses, other objections and costs. The exact packets, prompts,
outputs, traces, settings and usage records are retained under
attempts/v2/. Each job's result.json includes output
SHA-256 and confirms that packet inputs were unchanged. The 37-file frozen
bundle and treatment text are pinned by the experiment plan; version 2 used
the same evidence, model and treatment for both arms.
Execution history
The first launch of the version 1 control writer failed at provider routing inside the outer workspace network sandbox, before inference. Its raw record is retained as an infrastructure failure. A retry produced a draft in 182.7 seconds but exceeded the predeclared 1,000,000-token accounting ceiling: 1,283,864 reported tokens, including 1,191,936 cached input tokens. The version 1 record is cost calibration only; that draft was not semantically scored. Its trace contains 23 completed command executions and repeated reads after truncated output.
Version 2 sent the same required documents inline in each initial prompt and kept source files accessible for targeted checks. This common delivery change started a new version. All eight scheduled jobs completed with no timeout or budget overrun, in 332.32 seconds of aggregate model runtime and 1,950,094 reported input-plus-output tokens. That total counts cached input; it is neither a context-window size nor a billable-token estimate. All required output sections and blocker syntax passed the coordinator's mechanical check. The large difference between version 1 and version 2 control-writer usage is an operational observation, not a controlled cost-effect estimate.
The pilot is a development case built around a known failure. It tested a combined writer and reviewer treatment, with no isolated component arms, correction rounds, repetitions or held-out cases. The original and qualified fixed drafts test local target claims, not the entire document as a gold standard. The result supports a decision to refrain from adopting this combined treatment on this evidence; it does not establish that the wording never helps or that the control method is reliable.